Inducted Before They Arrive
If a site manager's delivered an induction three times before 11am on a random day, how consistent was it?
Most construction companies treat inductions as a one-time tick-box: delivered in person, logged on paper, and forgotten.
This eBook exposes the hidden inconsistency inside that model, and what leading site teams are doing instead.
Inside, you’ll discover
- Why “technically inducted” isn’t enough, and the related CDM 2015 compliance gap involved.
- The cost of delivery inconsistency, and why the same induction can change subtly during the same day.
- Why paper records aren't reliable, and what an inspector usually finds when they arrive.
- What’s changed in construction and why expectations are higher than ever.
- What day one looks like when it works: operatives inducted before they arrive on site.